Showing posts with label Family Room. Show all posts
Showing posts with label Family Room. Show all posts

Wednesday, October 30, 2013

That's Cold

Old married couples have their "normal" (to them) back-and-forths that go something like what Abby and I have. For instance:

Billy Ocean is dressed appropriately for my first floor.
A: Hey.
G: You.
A: Get into my car. (You can guess the rest.)

Similarly, and on the same '80s pop vein, there's this gem:

A: That's cold (or) I'm cold (or anything else ending with the word "cold")
G: So's your heart.
A+G: Random Paula Abdul reference. (Is there any other kind?)

Paula Abdul would be VERY cold in my downstairs bathroom.
Well, now we have something else that's cold, apart from each of our hearts: our house. More specifically, our first floor. Each morning, we wake up, put our parkas on, grab our chisels, and start chipping the children out of their beds. We can leave meat and dairy out on the counters without fear of spoilage. We have a family of hibernating bears under our stairs. It's cold.

"Of course it's cold," you say. "You have 100+ year-old windows and your first floor is partially submerged underground." "Yes," I would reply, "but you see, I had installed an enormous furnace, along with bulkheads for distributing all of that heat. And I paid extra for insulation of Buffalo standards. And I yell at the kids to close the door, for fear of (and I quote, unfortunately) 'heating the neighborhood.'" Still, very cold.

Madonna would probably be okay with a shawl,
but those dogs in the video would need sweaters.
Madonna once sang "You're frozen when your heart's not open."  I say "you're frozen when your freakin' cold."  And yes, I say this from the vantage point of someone who went through the winters of '04-'05 and '05-'06 without heat. But I was a lot younger then, and didn't have to worry about potential Child Services intervention.

We sit on our couch after the kids go to bed, and immediately crawl under a blanket. Abby's nose is probably 40 degrees. And I strongly suspect our little issue with Lola wetting the bed a few times last week has at least something to do with her preferring not to get out of her warm bed to trek across the tundra that is our family room, into the icebox that is the downstairs bathroom. Let's just say we have issues.

A few months back, you may recall, we won a free energy audit courtesy of the county, for historic homes. Following the audit, we were supposed to receive a professional estimate on how an organization affiliated with the county and knowledgeable about the limitations of working with historic buildings could work to make our house more energy-efficient. (Read: warmer in winter). And hey, I'm all about up-front payments with back-loaded, long-term benefits-- bring 'em on!

So the audit guy came out, did his thing, and said we'd have his report shortly. Then... nothing. around Labor Day, sensing the imminent change in season, I emailed the county asking about the report, and was told there were "issues" (with the auditor, not with our audit) and we'd get things shortly. Two weeks ago, I re-pinged them, and was told I'd have the report no later than... last Friday. I don't want to be the pain in the ass to people who are giving me something for free, but by the time we finally get the report, there may be a glacier advancing on Silver Spring, starting from my property.

Proper gear for the Aurora and the Bungalow
(I write this while standing on my Red Line commute, facing an ad for Icelandair, with a smiling couple in thick sweaters and furry hats enjoying the Northern Lights; they would be properly clad to visit the Bungalow too late in the evening.)

So what do I do? I could spend a whole weekend going back and forth to Home Depot buying weather-stripping and that cellophane stuff for the windows and door-sweeps and a giant knit house-koozie, but in the end I feel that my professionally-done house deserves a professionally-done insulation job, especially since I have actual tourists taking actual photos of the place at least once every month on the neighborhood tour. And also because I'm pretty positive that once I finally plunk down the time and energy on doing it myself, the county will call me, all ready to go.

In the meantime, we have decided to close our upstairs registers and pump the heat up a few degrees, with an eye toward tricking the HVAC system into warming things up downstairs without baking the upstairs. We've made sure all of our duvets are washed (following Isaac's barf-o-rama last week, and Lola's aforementioned string of accidents the week before) and on the beds. We turned on the fireplace during Isaac's party, which made the upstairs nice and toasty; the temperature downstairs may have been fine, had all the kids not kept leaving the door open (and heating the neighborhood...).  Oh, and we're stocking up on soup.

Here's hoping the county gets to us before we go the way of the Woolly Mammoth. (Or at least the way of that poor snake Paula Abdul was singing about back in the day.) In the meantime, we can only dream about the point whne we'll get to another of our regular-to-us conversations:

A: I'm hot.
G: And modest.
A: (Rolls eyes.)

Wednesday, October 23, 2013

Pianoless Foyer

It's been a while, but that's because the physical work on the house has ended, so we're pretty much not doing anything else house-related. Um, no. It's just that we've been pretty busy, what with life and everything, that we are trying to do a better job at balancing house and life. Abby took a ten-day vacation to Greece with her mom, I escorted a group of 40-some fellow Buffalo Bills fans on a 1000-mile round-trip pilgrimage, and of course there's ballet and soccer and school potlucks and work. But stuff's going on, I assure you!

First off, we've submitted our paperwork to the Maryland Historical Trust. That long process two years ago, with all the approvals and denials and back-and-forth about the color of our roofing shingles and the width of our doorways? We filled out the forms, sent in a bunch of annotated pictures of various places in the house where there had been consternation on their part over what we were going to do, and are now sitting, crossing our fingers like we did two years ago. Except whereas the process then ended with their blessing for us to go ahead and begin work, the process now ends with a big fat reimbursement check. Needless to say, this process will hopefully end in celebration, just like that one did... Just without the use of sledgehammers on Christmas Day.

But in the meantime, life goes on, and progress has happened. During a weekend spent with my parents at the house a couple of weeks ago, my dad and I put together Abby's closet with one trip to Home Depot and about $40 in materials. (Sure wish other stuff worked that well!) It was a nice feeling of accomplishment, with my dad directing me as if I were working on my carpentry-for-dummies merit badge. But in the end, it looks/works great, and I had fun with my dad in the process. (Afterwards, he commented that it'd be nice to come over once and not talk about what's wrong or still needs to be done with the house, but I'll believe that when I see it; I'm convinced those are two of his favorite conversation topics!). Unfortunately, we weren't able to install the hot-water tap. The contractors had said they'd do it for $200 and I balked at the cost. So of course, when I call an independent plumber, they quote me over $600. I turned around and asked the contractors to help, like we swore we'd never do... And am still waiting for them to respond... And I don't blame them!

I did have one experience with lightning-quick response from the contractors since I last wrote. You may recall my grandmother's piano had been sitting in our foyer for a LONG time, since the contractors said they'd get around to moving it downstairs when they had enough guys on-site. That's because it arrived from Buffalo when we had no floors downstairs. Well, it had been six months since we moved in, and still the piano sat in the foyer. With Abby nearly ready to come home from Greece, I wanted a big "wow" for her, and knew a closet wasn't gonna cut it. So I cut a deal with the contractors: you have your guys come over to finish unfinished drywall in the storage area downstairs, trim the door to that room, and drill for and install the doorknob, and I'll pay someone else to come move the piano. I had never seen such a quick response from them. The workers came over the next day-- a day on which I *cough cough* felt too sick to work ;) -- and after a quick trip to Home Depot to buy five 8-foot-long sections of trim, the work was done. The same day, I had Johnson's Piano Movers come by and, after 45 minutes of figuring out how exactly the instrument could/couldn't fit down our semi-circular staircases, I suggested they take it all the way around the house and just go through the back door. Sure, they had to tip it on its side to wedge it through the mud room and had so little clearance once inside that removing the night-light from its socket made all the difference, but we now have a piano in our family room. And, way more importantly, we have a pianoless foyer. (It's actually really weird still, even two weeks later, to stand in such a "wide open" entranceway. And I still have to force myself to go down the west staircase, after being so used to it being blocked by the piano and its adjoining piles of stuff.

Speaking of Johnson's (as in the piano movers), one not-so-good thing that's happened in the last little bit is that more than half of the bushes I planted this summer have died. You may recall the eight bushes I planted on the hottest day of the year, when Abby and the kids were in North Carolina and some schmuck had just run off with my new bike. Four were from Merrifield Nursery, four from Johnson's in Olney, and all were expensive. Luckily, or rather, hopefully, buying expensive plants means buying warranteed plants. Now I just have to find a time to dig them up and replace them; maybe when my parents are over again next weekend. So three of our four Arborvitae survived-- only "Eileen to the Left" is kaput; but everything from Merrifield's died, including the really neat curly-haired cypress. All of 'em still have the tags on them; now I just have to dig out to receipts. But digging the actual plants out will be well-timed, actually, since we have a ton of bulbs that can go into the ground at the same time.

So that's the update for now. Lots of mundane stuff, but that's what happens when you actually live in a house, right? Little stuff, like last night was the first time we turned on the fireplace; i sat on the couch next to it and read "The Giving Tree" to Lola before bed. And our freezer door opens only half as much as it used to when the fridge door closes, thanks to a shim the contractors put under it; it's effectively leaning forward because of the slant of the kitchen floor, which used to be a porch floor, and there's only so much you can do to fix it. Thinking of getting childproof locks so we don't have to deal with a defrosted icebox every time one of the kids gets some juice. And this weekend is the big test: our first house party, for Isaac's birthday. In the meantime, though, just life in the house. And so far, it's working. :)

Wait-- where did the piano go?
What will we do with a pianoless foyer?!
 
The piano rolling down the sidewalk by the kids' rooms...

...and then through the backyard...
...then into the mudroom...

...and into the family room...
...where it belongs!  FINALLY!

Monday, June 24, 2013

Welcome to the Neighborhood

Scene of the Crime
Before I start today's installment, I just wanted to send a big, hearty FU to the jerk that stole my bike this weekend.  You see, I did go to Wal-Mart and buy a cheap bike because I didn't want to be upset if a more expensive one were to have been stolen, but I also figured any loss would be because I did something like leaving it out on my porch overnight-- as I've done several times-- or forgotten my lock or something.  But no, it was stolen over the weekend while it was locked to the bike rack at Forest Glen Metro Station.  You know-- the station in the suburbs to where I moved, as opposed to the one in the iffy neighborhood back in the District from where I moved.  But hey, in the interim, before I re-buy that $94.94 basic blue bike again, maybe my face will clear up, because it's just exploded since I started sweating in the morning on the bike-ride in.  Back when we lived in Petworth, we had a bunch of stuff stolen; in fact, both my dad's and my mom's bikes were stolen from our front porch last fall, but that was my own stupidity for leaving them out on the front porch.  Isaac's winter jacket was stolen from inside his pediatrician's office one winter-- now that's desperate-- and some jerk stole all of my CDs, my stereo, and a whole bunch of expensive tools from a friend's uncle who was helping us renovate, which totally sucked.  But for some reason, this one hits me different.  I had thought I had moved away from all of that shit.  But here I was again yesterday, filing a police report and calling pawn shops.  Argh.

Our four newly-planted Arborvitae, that hopefully
will grow in nice, straight, narrow columns into
the spaces between our windows.
The lovely incident came in the middle of what was an otherwise productive weekend on our part.  Abby and I decided to go ahead and start planting in the one area in which we have the power to do so at this point-- the tiny strip of "yard" on the south side of the house, along the kids' windows.  We drove up to Johnson's, a huge local nursery way up in Olney, and out of all of the amazing stuff they had, we ended up buying four Arborvitae.  Yep, Arborvitae, the generic, everyone-has-three tree-bush.  But we arrived at the purchase after consulting with a nursery employee who knew everything they had to offer.  Our need was for four thin, narrow, tall evergreens that are good in full sun.  Arborvitae.  In fact, we have a sad, little Arborvitae in front of the Petworth house that we bought from Johnson's in Tenleytown; his name is Johnson.  (And yes, we name our plants, for those of you who aren't aware.)  We made our purchase on Saturday, then kept them out in the yard overnight, since we had tickets to see Daniel Tosh that night.  (Good thing no one stole them!  Grumble grumble grumble...)  Sunday came around and it was pouring out, so I waited for the rain to subside, then went out to dig holes.  By the time I was done, the sun was blazing, and it was about 340% humidity, but we had four new Arborvitae planted outside.  And two of them are already named: the woman at Johnson's was named Irene, so of course the two are "Irene to the Left" and "Irene to the Right."  (The ones in the middle remain unnamed for the time being.)  The bushes or shrubbery (another shrubbery!) are coming next-- maybe even this weekend.  But for now, it's the two Irenes, the two no-names, the brand-new sidewalk, and a colony of wasps on that side of the house.

New sidewalk, new plantings, more to come.
Inside, some work has been done since the infamous list of 13 items was unveiled.  Most of it, unfortunately, was not done by our contractor.  He insists that the only major thing left to do is to show the evil inspector the retaining wall, which will require digging up our front yard again to show him underground.  He had better not kill my hosta,  I'll tell you that!  He supposedly needs three consecutive dry days to do this, and it's true that it's been raining non-stop the past few weeks.  He claims the rest of the things that need to be done can be done in about two hours, and he has all the materials in his truck, and they'll all be done on Wednesday at the earliest, if there's no rain forecast.  Hopefully, the things that need to be done will be done a bit less haphazardly, unlike the way he "fixed" the problem with the poorly labeled fuse box.  (Abby was furious when she saw it, and wrote him a pretty nasty email about it; he claims it was a temporary fix.)

Our new upstairs shower, and the new gray wall at left.
But other stuff that has been done include our shower door, which was finally installed last week.  I took the first shower upstairs, and was really happy with the size of the enclosure, which is a relief, since I had thought it would be really tight.  I guess standing naked in the space gives you a bit better idea of how it feels than when you are clothed...  Abby's still concerned about the window, since she showers at night, but she's got this totally ghetto wood block she puts up over the glass (which you can't see through, because it's pitted, but you can still see shadows) when she uses it.  Hopefully that'll all be moot once our front landscaping's done.  Also in the upstairs bathroom, we decided the walls looked too boring, and unfinished.  I complained to her that I wanted a bathroom that felt like one in a nice hotel, and got one-- downstairs-- while the upstairs one, which was mine, felt like a Days Inn.  A simple coat of gray paint on one wall may just have done the trick, and although they're not in yet, the towel bars should finish things off nicely.

Our newly-painted black-on-black family room walls
Elsewhere, Abby painted the white trim in the family room downstairs black to match the black walls, and immediately doubted herself because it cast a shadow.  She claims she wanted the black-on-black look to blend in with itself, rather than to stand out.  I don't quite understand, and told her-- likely to her frustration-- that I liked it both ways, but that it'd be awfully hard to re-white the stuff she already painted black.  So she finished it up, doors and all, and turns out we both really like it.  It may not be what she had envisioned, but those of us who know Abby also know her imagination sometimes leads her to magical lands filled with perfectly done, affordable, clean, timely homes-with-character, and, well, that's just a fiction as far as I'm concerned.  But I like the walls.

"Magnetite" is pretty much the same color Magneto wears.
I also painted one wall in the computer room the same gray as the front foyer-- so yes, now we have three different colors of gray in the house, in addition to all the white.  This one is called "Magnetite," but I think I'd just call it "Dark Gray."  Back when we had the floor finishers in the house, they were laughing at Abby for painting the walls so delicately, claiming that if she used more paint on the first coat, she wouldn't need a second coat.  So I tried that, but I think it still might need a second, which sucks, because I really just want to watch TV tonight...

Other than that, not much else is going on.  Just waiting for the damn inspection.  Mark stood Abby up twice last week, after she had called him demanding a meeting to talk about the snail's pace he's been on.  My parents were here for the weekend, and offered to help us do stuff, but there wasn't that much to do; my Dad helped us put doors on the cabinet in the mud room, but their biggest help was watching the kids when we went out on our Tosh Date.  Oh, and we were picked by Montgomery County as one of ten historic homes to get a free energy audit this Wednesday.  A few years ago, our friends Siobhan and Perry in New Jersey got an audit sponsored by their electric company that ended with a plan for how to make their home more energy-efficient, and the ability to pay for the work over time as an add-on to their electric bill; that was an amazing idea.  We had the same thing in DC a year or so ago, but it ended with an email showing us where we could do things ourselves.  We did like two of the things, but got sidetracked by this place.  This time around, I'm hoping the audit's a lot more like New Jersey's than the District's, because I'm totally willing to pay for the upgrades, but I have no patience to go out and get someone to do the work; tell me what's wrong, fix it yourself, and take my Master Card, or fuhgettaboutit.  In the meantime, I'll be sitting here, waiting for my inspection, ducking wasps, and getting to know my local pawn shops with the hope some idiot will come in with my month-old 26-inch blue and gray Roadmaster Granite Peak 18-speed bike from Wal-Mart.  Welcome to the neighborhood.

Thursday, April 18, 2013

First Post Post-Move

It's been a week since I last posted, but don't be too mad, because I have an excuse: we don't have Internet access at home.  Yet.  

Didja get that?  Home.  Yet.  Yep: we've moved in.  HALLE-FREAKIN'-LUJAH!

Late last week we said it was time to cut the cord, so we pulled up stakes from our DC house and moved almost all the rest of our stuff into the new place.  By Saturday evening a very good chunk of our belongings had made the six-mile trip north across the state line in three car trips, and by Sunday evening there were only a few things left.  (Actually, just as we've been living in the state of perpetual "just another few weeks" since last summer, it seems as if this week has been a state of perpetual "just another carload or two.")  By today, though, we officially have one carload left, which we'll pick up tomorrow: our tv and the aquarium.  And that's it.  We'll be moved.

What that doesn't mean is that we're living in something that would resemble a normal living situation.  We've got boxes everywhere, piled strategically so as not to block access to things the contractors will still need to get around.  And believe me, there are still a lot of things, which I'll enumerate at the end of this post.  But I want to focus on the positive, because, at least as concerns the house, this has been a great week.

So where to begin?  I'll go room by room and give updates.  In the kitchen, the countertop has been completed, including adding the extra hole at the sink for my beloved hot-water tap.  The sink is in, too, but no plumbing has been hooked up.  I believe that's the last step before livability, but since we have water in the bathrooms, we're making do.  (This very much resembles the "fancy camping" we lived through for such a long time with the old house, only this will not last nearly as long.)  The fridge is turned on and mostly stocked.  The missing cabinets still haven't been delivered, and Home Depot is going to let us know when they are.  We have a few extra cabinets that were mismade, and they keep calling to have them picked up and returned to the store.  But the timing on this is getting out of hand, and I'm going to insist to them that they put us out and we deserve to keep at least some of the misfits-- especially since a couple of them will fit really well elsewhere in the house.  The range is in but not on; the range hood is not in, but the hole for it has been cut; the microwave is in but not framed, and Isaac inaugurated it by reheating leftover pasta.  The dishwasher looks too small for the hole it's supposed to fit in, but we're going to wait until the cabinet guys come back for the final install because, who knows, maybe it will magically fit in.  I think, though, that we might have to get a new dishwasher and do something with this one... although I can't imagine what.  And all the lights are in, including the two pretty ones with the incredibly wasteful Edison bulbs.  Abby always turns those on, and I turn them off, because they cost a fortune to light.

Our bedroom is the room that's probably the most complete.  The closet had already been installed, and over the course of a few nights almost all the shelves and hangers and drawers were filled up with clothes.  I had to reinvent how I folded my tee shirts, because the old way was only filling the front half of each shelf; by folding shirts in thirds, I now get 50% more shirt per shelf.  I bought one of those tie hangers that holds like 40 ties, but it's hard to use and only gets about two-thirds of my collection onto it; similarly, I bought four of those five-pants hangers from IKEA and I don't like the work it takes to take a pair off without disturbing the others.  Both save space, but I'm going back to my regular tie rack and one-pair-per-hanger style.  Abby put the new bed together-- which is the same as our old bed, except a new frame, since West Elm gave it to us for free.  The bed fits right up to the windows, with both side tables in the room, with only a few inches to spare-- perfect fit.  The first couple nights in there, we switched sides of the bed to see which would work: on night one, I was on the closet side and she was on the window side; on night two, we switched.  Night two was incredibly awkward for both of us-- it's so weird, but after two nights, I believe we have decided what side of the bed we'll be sleeping on for the next couple of decades. (And it's neither the same as we had it in the old house or the way I had expected it to be, since Abby's usually freaked out being next to windows.)

The windows do freak us out a bit, but I think we'll survive!  We ordered custom-made cellular blinds, which arrived at the house on Saturday; just waiting for them to be installed.  Once installed, they'll not only help with shielding from onlookers, which seem to be everywhere, since the house is located pretty much in a giant fish bowl, but will also help with efficiency.  They're made to be pulled up from the bottom, so we'll be able to block off the bottom half or two-thirds of the window, but still let in natural light from the top part.  It'll be nice to be able to change my clothes in my own room, or to sleep without knowing everyone can watch me from the street.  This morning, for instance, I had my pants on but decided to change shirts, so I was standing there looking into my closet when a neighbor walked by.  I'm sure it looked like I was standing there naked, but, well, I wasn't, so there.  Next week at this time, hopefully the blinds will shield the neighbors from the less-than-flattering exhibitionist that is my pasty self.

The great room is pretty much the same, since it had been painted way back.  The up-lighting along the sides looks great, and even the workers agree-- I think they thought Abby was a bit weird for her choices in there.  Instead of spot lights or track lighting, she chose these little linked LED lights that were plug-ins, and had them hard-wired in so each light lighted the area between two of the rafters.  It looks really cool-- the only problem being that they were wired in a weird way, so if we want all of them to be on we have to flip four different switches, one in each corner of the room.  We put Anyu's dining-room table together and have actually been eating at an honest-to-goodness table, rather than on a trunk disguised as a coffee table in front of the TV in the basement with the kids sitting on the floor.  We don't have chairs yet, but since they're going to be a major purchase, we're going to wait with them until the construction is done-- don't want them to get scratched right away if we can help it.  Oh, and the fireplace is in and turned on.  Actually, it was so turned on that when we got back from Florida it was about 80 degrees inside, even though it was in the 50s outside.  We still have to learn how to make it work, because it's a little trickier than we had hoped, but I think we'll get it.

The front door has the wrong hardware on it, but other than that it's the same.  And the front foyer has been painted really nicely in the same gray color we used in the downstairs bathroom.  And what do you know: our wedding lily made it through our vacation and is still alive, so I rewarded it with a good dusting and a move into the bay window.

Downstairs, the kids' rooms are both moving along.  Their beds are semi-set-up, in that they're sleeping in them but the frames are not done altogether.  My sister came by this weekend and helped put together some of their furniture, so now they each have a desk and a book case.  Once all my clothes made it out of my old dresser, Isaac inherited it, we stuck it in his closet, and his clothes are also all put away; only Lola's remain sorted in a laundry basket and suitcase.  Both sets of closet doors have been delivered, but aren't up yet.  Abby even helped Isaac decorate his ceiling with a solar system set he got for Christmas (or was it Valentine's Day?  I don't know... Abby gets them presents for everything, which is a point of contention...)  Anyhow, it's coming along great, and more importantly they love their rooms.  There have already been more than a handful of times when they've disappeared into their respective rooms to play.  Alone.  Quietly.  (I know!)  However, one of those times?  Yeah, not so good.  I got back from picking a load up from the old house on Saturday and Abby was fuming, and Lola was pouting.  I guess the kids found their spin-art toy that takes paint and splatters it all around on a piece of paper that spins around... and started playing with it on their own-- and more importantly, on the new floor.  They had paint all over their hands, and got it all over Lola's floor, and we hadn't even slept there one night.  Abby was furious, and the toy has been banished.  Luckily, the mess cleaned up because it was caught early enough.  Phew!

The family room actually has a seating arrangement, and once the TV arrives tomorrow (we need to bring it when there are no kids in the car but two adults handy, since it's heavy and requires the seats to be dropped down) it'll go in.  We won't have cable yet, but that's only days away.  Last week I called Comcast again, and they again insisted they don't cover our house.  9610 and 9615 and 9620 Dewitt Drive?  Sure.  But 9618?  Yeah, no.  I insisted they were wrong, and implored them to come out to check.  36 hours later I get a call: "Mr. Wahl, we'd actually be happy to charge you $200 a month to watch ten channels and check your Facebook status."  Actually, that's not exactly what they said, but it's what they meant.  They're coming by on Tuesday to install cable, Internet, and potentially a security system.  We don't know yet whether we'll do that, since it's such a good neighborhood.  But Abby's freaked out by the windows-- understandably-- and the fact that the kids are on the ground floor, so my money's on us having it installed.

The laundry room?  Well, apart from being able to move the washer and dryer back from where they were perched so close to the door, nothing looks different.  But it's so incredibly nice to have in-house laundry back.  Those nearly five months of begging others to allow us to wash in their place, or going to a laundromat even though we own two washers and two dryers, was definitely wearing on our patience.  I have a load of laundry going as I type this, and no one's paying attention to it, and that's how it should be.  It's nice and quiet, too, and plays a silly little electronic song when it's done, just like my parents' does.  On the other side of the floor, though, things are not so quiet.

That's where the water heater is.  What, you didn't hear me?  I said, "THAT'S WHERE THE WATER HEATER IS!!!"  Yeah, this thing is crazy loud, and I'm not happy about it.  I'm wondering if it's the difference between having a gas water heater and an electric one-- our electric one in DC never made a peep, but this one sounds like an espresso machine gone berserk.  We don't have it enclosed-- yet-- but believe me you, that will happen.

The bathroom is great, and taking a shower down there (since we don't have a shower door upstairs yet) is really nice.  The water heater is directly behind the shower, so it's instantly hot.  The window fogs over in about 30 seconds, so there's no putting on a show.  (We're going to frost the window, so sorry potential peepers.)  And I managed to cajole Abby into letting me put fluorescent bulbs into a couple of the fixtures.  The toilets flush beautifully, and ridiculously fast.  And the door locks.  Did you hear that?  For the first time, we have locking interior doors.  It's magical, really.

So that's where we stand. In the morning, I've been getting up ten minutes earlier than in DC, and getting to work right on time.  The way home I can't judge yet, because this week I've had to stay later than usual, and the Metro at 5:00 is way different than it will be at 4:30.  One day I got home in under an hour, and the next it took me nearly 80 minutes because of a delay on the Blue Line.  (I couldn't get mad, though, because the delay would've affected my old commute as well.)  I'm definitely gonna get a bike to park at Forest Glen station on nice days, but for now, especially since I've got room on my SmarTrip card, I've been taking the Ride On bus to and from Silver Spring station, since its schedule lines up perfectly with mine, especially in the mornings.

Once we get settled, I'll be able to write with more frequency again, and will post pictures.  But for now, I leave you with an email we sent to Mark this evening, of things we need to discuss tomorrow.  (My more frequent readers will see the tone has changed a lot since the last letter of demands... for the better, that is.)  It seems like the closer we are to the finish line, the more things there are to do.  But we're moved in, and that's all that matters.  At least this week :)

Mark: here are the current issues with the house. We would like to discuss them with you on Friday, but wanted you to be aware of them as soon as possible. Thanks, and talk to you soon. -G

1.      Flooring issues: There’s a really weak spot in the great room just in front of the kitchen doorway.  Every time you walk by, your heel depresses the spot a lot; also, in the same spot ther's a nail sticking up.   Also, in our bedroom, just at the entrance on the right, one of the boards is split lengthwise, and will catch on your socks as you walk by,  Definitely just waiting to pull right up and out.‬
‪
2.  After the inspection, your guys can come in and cut down that backsplash, which is still ridiculously high.  The electrician installed the outlets vertically on the backsplash, even though we requested (and he said he could do) horizontal.  The height of the backsplash is unacceptable as is.‬
‪
3.      We’ve purchased a chandelier for the dining room and are waiting for delivery.
‪
4.      We need to switch a couple pieces of the door hardware that were installed in the incorrect place.  We need the knob currently on the back door switched to the front door.  (I labeled all of the knob  boxes… don’t know why this one was put in where it was.)  Also, the deadbolt in the back door was installed improperly; it locks from the inside, but there’s no way to lock or unlock it from the outside—the knob doesn’t catch for some reason.‬
‪
5.      I bought the lighting timer that I wanted to have installed for the switch beside the front door, to use for the front porch lights.  It requires a neutral wire, which is why I called you from Home Depot on Sunday.  Let me know if this is not possible, because then I’ll exchange it for the one one step down, which does not require a neutral wire… I just like this one better.‬
‪
6.      We have an old-fashioned doorbell that we’d like to have installed on the front door.  It’s sitting on a box on the piano (which itself can be moved downstairs if you guys can do it) and the directions and hardware are all in the box.  Abby can show the guys where it goes; it actually gets mounted right to the door, I believe.‬
‪
7.      Also, Abby will show the guys where we’d like the address numbers to go.  Apparently, not having them up is very confusing to a lot of people (FedEx, mailmen, etc.) so putting them up would be a good idea.  We’ve given up on finding the mailbox, so we’re just going to buy a new one to have mounted on the wall.  Both the mailbox and the address numbers will go on the wall to the right of the front door, as you look at it from outside.‬
‪
8.    The water heater is crazy loud!  We will definitely want to have it encased once all is said and done.  I have never heard our water heater in DC make the noises this one makes—we can hear it in the kitchen! 
9. You can hear everything between the kids’ bedrooms. Abby installed her secret passageway and discovered there was no insulation in the wall. I'm very disappointed with this, since we paid more than $1000 to have this done throughout the house.‪
10. The light fixture in the mudroom is too low and needs to be raised.
11. The spigot outside is dripping.
12. The issue with the front door opening outward has not been resolved.
13. The paint on the stair risers still needs to be scraped.
14. The doors for the bathroom and upstairs closet can be installed.
15. What is going on with the PVC pipe looping out of the left side of the roof (as you look at the house)? Also, there's a pipe of some sort sticking out of the ground by the back door.
16. One of the great room ceiling lights (the one all the way to the left above the kitchen door) keeps going out.
17. What is the switch on the countertop for? There will be no garbage disposal, and the hot-water heater stays on all the time with a plug.

Thursday, March 14, 2013

Updated Video Tour

In lieu of a full update on what's going on, I give you yet another installment of the Alpha Bungalow video tour, hosted by Isaac and Lola.  This time, you get all the absentmindedness of the previous videos, but with a bit of face-pulling from Isaac, some fussing from Abby, and just a touch of sibling rivalry in the middle.  It wouldn't be a trip to the Bungalow without some whining from the Wahls now, would it? Enjoy! (And I promise to have a full update on here soon enough.)  --Gregory

Monday, February 18, 2013

The Heat is On

Apparently, Glenn Frey
is the love child of
Randy Travis and
Chris Isaak.
Who would have thought that , 20 months after buying this house, I'd be praising the lyrical genius of none other than Glenn Frey.  Yes, Glenn Frey, that guy from the '80s that can't even be classified as a one-hit wonder, but really just the guy that happens to sing that song that goes "the heat is on."  Because, really, do you know any of the other words?  Well, I looked it up, and they are uncannily appropriate:


The heat is on, the heat is on, the heat is on
Oh it's on the street, the heat is on
It's on the street
The heat is on, the heat is on, the heat is on
Yeah it's on the street
The heat is on

I mean, can you get any more spot-on to describe what's been going on with our house these last few days?  First off, I should mention, the heat is on!  Yes, we managed to get Washington Gas out finally to install the gas meter.  That was important because none of the woodwork stuff can happen without at least some semblance of a controlled temperature.  Now, for instance, Mark can go tomorrow to pick up our wood floors; they need to be acclimated to the house for three days before installation, which basically means they'll be going in around the weekend.  And upstairs, the floors have also begun to change.  No need to show you what they looked like before, other than to remind you they are the original 1890s floors that have been on the ground in a house that's been pretty much derelict since the 1980s.  But this morning when we pulled up, we found Miguel and his three floor-doing machines (that's the technical term), each of which, we are told, cost more than $2500.  (Having been robbed back in 2008, and having most of what was taken be contractors' machinery, we told him not to store them in our house overnight.)  And Miguel (with his lovely and cold wife watching) did this to the floors on our upper level:
Yeah, I didn't recognize the floors either.

The schedule for the floors as we move through the week includes fixing any boards that need to be fixed (tomorrow), stripping the stairs (Wednesday), and then applying various ointments and salves as necessary.  Once the stairs are being touched, we won't be able to down them for a few days, so we've been getting as much use out of them as possible, having spent about 27 man-hours painting the lower level over the three-day weekend.  (Is "man-hours" a sexist term?  Well, Abby  painted for more than half of them, so deal with it.)  And, more than Miguel and his lovely and cold wife, we felt the brunt of this weekend's drop in temperatures.  Sure, Glenn Frey says the heat is on, and every once in a while we hear the heat going on, and if you're standing directly beneath a vent you can feel the heat being on, but overall we are very worried about the efficacy of our heating system.  Granted, the heat is currently set to about 55, just so we can have that semblance of environmental control necessary for flooring operations, but there is what Bostonians might call a wicked temperature gradient between the upper and lower floors going on, and it can't all be the fault of the fact that none of the doors or windows have an actual tight seal to them.  (Remember, as Glenn Frey said, "the heat is on, it's on the street."  He wasn't kidding.  We are, as every suburban dad likes to remind his kids, heating the neighborhood.  I happened to get a flyer from a home-efficiency company in the mail the other day, and I will be contacting them shortly to see if there's anything they can do about our windows.  Because we all know that ain't gonna get done with our contractor.

Our contractor.  Yep, the one who pulled all the radiators out of the house, then claims not to have realized there were so many holes in the floor so as to warrant a higher cost of replacing wood during the flooring process.  The one who seems to have alienated all of his subcontractors along the way, many of whom are quite candid in letting Abby know just how they feel about him.  One thing we have learned, however, is that however unsavory the contractor is, apparently everyone's smitten with the workmanship.  So hey, it may take two years to get this thing done, and we may have to send our kids to work in Kathie Lee Gifford's sweatshop, but by golly the work's great!

While talking to Abby about the house while driving to my parents' out in crazy-far Virginia on Friday (they have a "540" area code! "540!" Have you ever heard of that?) I was mentioning that while I really like a lot of what's happening with the house, I don't feel as personally invested in it as I did our DC house, because we did so much of the work ourselves last time.  I mean, I can remember my bloody fingers after applying muriatic acid on the brick, and I can still see the mummified pigeon fall on my coworker Billy's head as he stood on the ladder in Isaac's bedroom.  Yet prior to this weekend, the only things I actually did to this house, besides that very first day of knocking down drywall back on Christmas Day 2011 (2011? 2011!) was pick stuff out and pay for it.  And a lot of that stuff that I picked out never even came to fruition.  However, three days later, I can safely say that those 27 man-hours of painting have taken a big bite out of my worries.  (I can also verify that we listened to DC101 the whole time on the radio, and heard exactly one song featuring a female singer.)  We did some painting, and some more painting, and some more painting.  And now, that downstairs is painted like a mofo, and Abby and I had everything to do with that.

Abby had been going to paint for a week or so beforehand, and I had posted a pic last time with her in Isaac's room, but this is serious stuff.  Since that last posting, she ripped down the carefully placed painter's tape she had put up in his room, re-sanded the wall because she was unhappy with the alignment of the stripes, borrowed a laser-level from Lee, and painstakingly created a masterpiece of stripe-itude that can be marveled at from hundreds of feet away, since it faces out the window.  Seriously, it's impeccable-- judge for yourselves:

Abby's creation on Isaac's wall.
Notice the perfect alignment with the window panes.
Besides Abby's magnum opus in Isaac's room, which eventually will be a Buffalo Bills room, with red accents, she also managed to paint Lola's walls a lovely shade of what we're calling "Cinderella's Dress" blue, based on the sheets and pillows she bought for Lola in what could have been 2011, and have been sitting in storage now since Thanksgiving.  I thought this was going to be more teal than it is, but it's so bright and happy that who cares?


My job on Saturday and Sunday was white.  Abby had done a whole bunch of white prior to this weekend, so anything colorful was her bailiwick.  So I managed to get one coat on every white surface (walls and ceilings) in the family room, the laundry room, the storage room, the guest room, and the guest-room closet.  Abby was at once excited by my progress, appalled by the lack of attention I had while making several only-noticeable-to-her drips, and confused at how I could get so much more square footage done than her during the same timeframe.  Well, one of my wise commenters noted last time that while you want painting done fast, cheap, and well, you can only get two of those at a time, so there's that...  No, just kidding, I think I did a stand-up job.  (And for that, both Abby and I will be completely stiff for the first half of this week.)  
Isaac next to the newly-painted wall in his bedroom.
We let them draw on the floors, since they're just sub-flooring
and will be covered over within the week.
Can you see the white I painted in the family room?
Just nod your head and be nice, will ya?
While Isaac's striped wall may be the most technically difficult paint job we completed this weekend, definitely the boldest, and possibly the most likely to provoke ire, is in the family room.  The picture I posted directly above this one is purposely taken from this angle so as not to show you the wall to your right-- the one that you see when you come down the stairs.  It was Abby's opinion that this needed to be a "statement wall," because otherwise the room was apt to become a boring giant box.  Therefore, I give you Behr "Poppy Seed."  If you think Abby was proud when the stripes were done, you should have heard her giggling like a little girl when this color was going up.  And as for me?  I'm Mr. Color when it comes to walls, so it makes me very happy as well.
"Poppy Seed" going up on the family room "statement wall"
The completed "statement wall"
The wall's actually a smidge lighter than the black on the windows.
Lola's "Cinderella's Dress" Blue is in the doorway.
The downstairs shower, with the
floor tiles doubling on the ledges
I mentioned earlier that we were en route to my parents', because they were awesome and took the kids for the weekend so we could get all of this done.  We drove out to Sterling last night to have dinner and grab the kids from them, since they didn't have the day off today like I did.  That meant we couldn't tag team the paint job today, so I took the kids to Jump Zone in Columbia while Abby painted from 10-5.  On the way, we ran two errands: one was just a normal Target run; the other was a drop-in at Home Depot to buy our second five-gallon white eggshell container, but also to return three boxes of tile we had over-ordered.  And how did we know we had over-ordered, you ask?  Why, because the tiling in the bathrooms not only has begun, but is almost complete!  So besides our paint-stravaganza this weekend, there was a tile-fest going on in the bathrooms.  The first-floor bathroom is complete, with three different kinds of tile up and done.  Abby decided a couple weeks ago to use the flooring tiles on two different ledges in the shower, and that turned out to be a great decision.  (See for yourself below.)  Unfortunately, the tiles that went up on the vanity wall, while all coming from the same boxes, had a slight color variation that wasn't caught right away.  It won't matter once the vanity is up, because it'll block those either in shadow or altogether, but I mention it here because when you look at it below, you might think "ugh."  Yeah, we know, but it's okay, unless you plan on laying on the floor in our guest bathroom.  So just don't do that.  The floor tiles in the upstairs bathroom have also been laid, but I don't have a good picture to show, since the lighting was really poor when I took it.
The vanity wall.  (Don't) notice the four mismatched squares of tile.
So what we have here is a very, very positive week, workwise.  I apologize for not getting more information up during the week, since some of these pictures were taken on Wednesday when we came by for the draw inspection, but we've just been so busy lately.  You know, with the house.  I mention the draw inspection, and some of you may be wondering what's up with the loan and our "drop-dead date" of February 15.  Well, we had the draw inspection on Wednesday, and the paperwork went through, but I have a feeling there may be a bit of consternation upcoming between us and the bank.  Because our idea is that, since we have spent the amount of money the loan had designated, they should give us the remaining balance and close it all out.  But I have more than a sneaking suspicion that they're not happy we decided to go above and beyond the amount of the loan on our own-- which was our only recourse, given the state of the house, and was the plan from the start.  So I don't know that we'll ever see the money from that last draw-- which'd be fine, because it'd just get deducted from the total on which we're paying our mortgage.  But we'll see.  However, what is definite is that we no longer have a mythical "drop-dead date" for a loan, and we're looking at a matter of weeks for the finish.  Yeah, I know I said that before, and no, we're definitely not going to be living in the house come March 1, but it's coming, and it's coming soon.  The floors will all be done by the end of next week, the cabinets will be completed by February 28, my closet can go in once the floors are done, and the plumbing fixtures can probably go in next week as well.  I'm going on another short business trip next week, and I am 100% certain that the house will look livable, even if it may not be 100% livable, by the time I get back.  At dinner last night, my parents asked me where I wanted to go for my birthday, which is the Saturday after next.  I would really love to have it at my house, but I know that's not going to happen.  But you can bet your ass that we'll be eating dinner at  Anyu's dining-room table, in our house, on Abby's birthday, 20 days later.  And those aren't famous last words.  Glenn Frey?  You'd better start writing a song about it.